Optimization of prefabricated single-span girder system (32 m).
|
Railway |
![]() |
Consulting, examination and training of on-site supervision for engineering structures, earthworks, tunnel construction and superstructures, track construction, overhead-cable and signalling technology as well ...
|
Railway |
![]() |
Supervision bei der Ausführung. Beratung, Überprüfung und Schulung der site supervision für Ingenieurbauwerke, Erdbau und Oberbau.
|
Railway |
![]() |
Design consulting for optimization of the prefabricated single-span girders with 32 and 24 m span width.
|
Railway |
![]() |
Consulting, examination and training of on-site supervision for engineering structures, earthworks and superstructure as well as production of prefabricated single-span girders with 32 and 24 m span widths.
|
Railway |
![]() |
Establishing of calculation manual in Chinese language.
|
Railway |
![]() |
Verification of serviceability of the viaducts’ superstructure for use of ballast-less track type Züblin.
|
Railway |
![]() |
Design consulting for ballast-less track in Chinese construction method.
|
Railway |
![]() |
The planned section between Hangzhou and East Yangxungiao runs completely over bridges, among them the superbridge over the Quianjiang River, length 1810 m. Included is the Hangzhou South Station.
|
Railway |
![]() |
The planned section runs over 12.664 km on subgrade, 30.718 km on bridges (64 bridges) and on 58.363 km in tunnels (36 tunnels). Included are two railway stations.
|
Railway |