High-speed railway line from Beijing to Tianjin, Lot 1 Intercity Railway

Client MOR Ministry of Railway, China / Jing-jin intercity railway Co. Ltd, China
Speed 350 km/h – ballast-less track

 

Consulting, examination and training of on-site supervision for engineering structures, earthworks and superstructure as well as production of prefabricated single-span girders with 32 and 24 m span widths. Control of supervision of girders on site.

Numerous culverts, 3 prefabrication plants, 3 'Super Giant Bridges' (single-span girders with total max. length of 36 km), in-situ concrete, continuous girder bridges with max. 60+100+60m span width, one arch bridge of 71m length

Earthwork: 3 earthwork sections approx. 3 km long, incl. Yangcun Station

 

Back