Test line Sui-Yu-Line: Suining - Chongquing

Services Consulting ballast-less track, switches, transition areas

 

Design consulting for ballast-less track in Chinese construction method. Consulting for final design, examination of static and dynamic calculations of the superstructure with ballast-less track; Japanese system, system Rheda and Rheda 2000, framing system and switches with 2 big bridges, 3 tunnels and approx. 12 culverts.

 