The Padma Bridge Rail Link is located in the Middle Western part of Bangladesh. The total length of bridges is 31 km. There are 3 high viaducts with a total length of 21.86 km, 66 major bridges with a total ...
|
Railway |
![]() |
The project is located 250 km north of Beijing in direction to Shenyang near the city of Chengde.
The length of the section is 54.40 km, including 15 Tunnels (total length 22.55 km), 1 Adit Tunnel (total ...
|
Railway |
![]() |
The planned section includes:
Huanghuashan Grand Bridge, Earthworks, Xiatang Grand Bridge, Earthworks (Left)
|
Railway |
![]() |
Consulting, examination and training of on-site supervision for engineering structures, earthworks, tunnel construction. Within the construction lot the line passes mountainous terrain and is designed mostly as ...
|
Railway |
![]() |
The line length is 40.82 km in lot 2, start from DK49+149.73 to DK89+970. The main works include subgrade engineering work with length 2.31 km, earth engineering work with 600,000 m3, CFG pile engineering works ...
|
Railway |
![]() |
The applied system of ballast-less track is the Chinese Railway Track System 2, a development of the system Max Bögl used for the PDL Beijing – Tianjin.
|
Railway |
![]() |
The continuous steel truss girder is supported by stay cables in fan-like arrangement. Pylons are of reinforced concrete as hollow sections.
|
Railway |
![]() |
The Nanjing Dashengguan Yangtze bridge is one of the main structures on the high-speed railway line from Beijing to Shanghai.
|
Railway |
![]() |
Supervision for work preparations, steel constructions at the plant and their execution
|
Railway |
![]() |
Supervision for work preparations, steel constructions at the plant and their execution;
|